Telephone Pole Installation Depth

utility that will cross a wetland area is to consider how to install the piping. Screw must go through both Top and Bottom (Inner) Poles. Side Console, Double Bubble and Walk-Thru Windshield models; Center bow 8’ rod storage, port 9’ rod storage. The gin pole is 21 feet long. One will need to be 20′ in length the other 16′ in length. Spray foam is available in two different types: open-cell spray foam which is usually $1. Our goal is to convert every residential overhead utility line in San Diego to underground service. INSTALLING POLES. 1-2017 provides minimum specifications for the quality and dimension of wood poles that will ultimately be used as single-pole utility structures. Feed the cable up through the bottom of the base and guide it out the top. After all, it’s not very often that powerline workers will install a telephone pole or utility pole with more than 1 or 2 cross arms. This handy valet pole is great for planning your daily wardrobe or packing for a trip. pole remains the foundation of power distribution in the 21st century. We offer fast and affordable solutions for utility pole, power pole and telephone pole installation. Tele-Power Poles handle all your needs effortlessly. what are the. Anchor rods are a pole line hardware item used for guying wires at utility poles. a technician will bring a fibre-optic cable from a telephone pole to your business. 1 Installation and Maintenance 6. Temporary meter poles for construction are the consumer’s responsibility. Accuracy is found to be better than 2% of the height measured, which equates to 3/16” over a typical communications cable vertical separation of 15”. Definition An extension of a point, elongated mark, connection between two points, the effect of the edge of an object B. >>> Pole Toppers. PacifiCorp released a draft of its long-term energy plan that continues investments in new wind generation and transmission, while adding significant new solar and storage resources. CAD Drawings and Details. Place a pole with bird feeders outside your window so you can watch birds from the comfort of your home. Wooden materials covered here include timber, lumber, wood-base fibers, commercial softwoods and hardwoods, wood preservatives, laminated timber, and composite lumber to name a few. If you're someone who likes to fish, chances are good you also have a boat, which means this is for you. In some situations it is possible to elevate the utility line. How to Install Concrete Pavers. A pole building can be easy to erect but for successful pole barn construction, the poles must be set correctly. Following this consultation, new detailed guidelines will be prepared for the use and safe. Our poles are manufactured to meet minimum tip load and moment capacity equivalents of wood poles under NESC Grade B construction. com To obtain location of underground gas and electric lines: Before digging, call the Texas One Call Center by dialing 811. In order to install Direct Burial Light Poles the correct backfill material for differing soil conditions should be used. Requirements for Customer-Owned Poles 025055 Page 4 of 17 Rev. Wooden telephone poles weigh 900-1000 lbs and the depth of utility poles should be 10% X pole height + 2 ft = min depth. Find Lateral Pressure for Given Depth: In this mode, the module will calculate the lateral earth pressures caused by the specified pole size, embedment depth and applied loads. 750” and “Information and Requirements for Electric Service—Green Book” and are in effect for the following National Grid companies:. Place a pole with bird feeders outside your window so you can watch birds from the comfort of your home. gov will be offline on Saturday, Nov. This is one reason installing them on existing light or utility poles is a bad idea. In this circumstance the duct must extend to a location where it is convenient to install the pole. Once dug to the right depth throughout the courtyard, fill the area up again. 1-2017 - Wood Poles - Specifications and Dimensions, is the result of this process. Choose a sunny location to install your bat house pole. Residential flagpoles are even easier, as footing sizes are smaller and poles are lighter. poles > 55 ft, the marking is located 14 ft ± 2 inches from the butt end. A more complete discussion of this foundation's capabilities can be found under the, "Notes to Designer", for the bridge conduit system. Concrete Pole Install T&D World. OVERHEAD TO UNDERGROUND If you desire direct buried cable because of obstructions or aesthetics, ComEd will provide such installation if practical. Two options are provided as indicated below:. Comprehensive installation by our delivery team that ensures dig alert coordination, temporary power pole installation, pole bracing, and multi-point inspection to ensure the temporary power pole is installed safely, to industry standards, and is ready for use by your team. Intelligent battery management, pioneered by APC, maximizes battery performance and life through intelligent, precision temperature compensated charging. Manual Pole Replacement. Telephone and utility poles are generally buried up to 10 percent of their length plus 2 feet. The advisory committee shall perform duties which may be assigned by the Commission, including the review of reports of violations of the chapter, and make recommendations to the Commission. If the trench is five feet deep or more it must be. utility-supplied source to a standby generator, enabling the user to readily maintain power during utility outages. 2 from 10 a. as we launch our all-new website. 1 SPECIFICATION FOR ELECTRICAL INSTALLATION GENERAL SERVICE CUSTOMERS Brantford Power Inc. Compaction requirements (in accordance with latest edition of ISPWC) i. Light Pole Bases, and more; Precast concrete underground utility structures are a perfect example of value-added engineering. 28 "Pole Attachment" means each communications wire or line attached to a pole, including, but not limited to, cables and service drops. • Conduit installation should not start until the staking has been approved by a Tampa Electric inspector. Closet Hardware Planning Guide Closet Organization Closet Pole Installation Tools Required First, measure the width of your closet. Manual Pole Replacement. The following is the trenching and conduit installation requirements for West Oregon Electric Cooperative (hereinafter called WOEC). Discussion of topics covered by the ANSI 05. create variety by using angular, broken, bent, thick or thin lines. Utility Accommodation Manual Table of Contents February - 2010 6 Page Section XVIII. They don't try to sell you the store when you only want a nail. Here's why. Our company performs work from North Carolina to Delaware. Like I said, alot of sweat equity from there. These methods,while expensive, will avoid or greatly minimize impacts to wetlands. Insert a (#77) Screw into each 3/16” hole in top Pole, two on each side of the Post Assembly. Wood Pole Inspection & Life Extension. Note: Some municipalities require conduit. With more than 130 million wood poles in service and millions of new wood poles installed each year, it is little wonder that wood remains the material of choice for poles used by the utility industry. Don't forget that erosion or root structure growth may shift the locations of your utility lines, so remember to call again each time you are planning a digging. Upcoming Workshops and Events. See illustrations for special applications. Pole Mounting Methods. (Refer to Step 2 of the installation instructions. c) Pour a concrete mixture around the pole. Article 230 - Services. Our company performs work from North Carolina to Delaware. If you're someone who likes to fish, chances are good you also have a boat, which means this is for you. Customer—A party supplied with electric service by a public utility. The farmer method is quick and easy, and gets the job done. Customer List Utility Pole Solutions’ Customer List [THESE COMPANIES HAVE ALL PURCHASED POLES FROM US]. Electric Service Conversion Overhead-to-Underground Pole removal $200 per utility pole. 5) For single spans, the pole anchors are located by extending. During my employment with TXU, the electric company for almost half the State of Texas, the hole depth formula was 10-percent of the pole height plus 3-feet. "Utility Permit Drawing " means a drawing of the proposed utility installation submitted to the City for approval. Differences in functional requirements between DoD Components may exist due to differences in policies and operational needs. During the design phase of aerial cable plant proposed for installation on AEP/AEP-OH’s poles, Communication Companies shall comply with the following policy: Safety is a concern for everyone. The hole has to be a lot deeper to self support! Otherwise, with any wind at all, the pole is going to come down. Watch for nails. Wooden materials covered here include timber, lumber, wood-base fibers, commercial softwoods and hardwoods, wood preservatives, laminated timber, and composite lumber to name a few. The pole or timber shall have inherent strength or be adequately guyed to support the service conductor. FortisBC Specification for Installation of Underground Conduit Systems Revision Date: November 2016 Revision No. Utility poles come standard in Type 1 colour and finish - which is a plain grey and with a mold finish. Utility Accommodation Policy and Standards Manual 2016 Revised: 12/01/2018. Standard Details and Specifications for Public Street Landscape Improvement Projects D-9 Installation Detail Fiberglass Liner Assembly Gallery E-21 Pole Top. " Therefore, in the case of a 40-foot pole, the. South Carolina Pole & Piling. Obviously, the pole's intended purpose will dictate it's location as well as it's finished height. Dig your hole to the desired depth and width using a shovel and a post hole digger. Add these two numbers to the height you need the light to be from the ground and then order the length of concrete light pole which comes the closest. 9 Temporary Service Entrance, Tripod Mounted Fig. R = ratio of depth of point rotation (x) to total embedment depth of pole (L) = x/L. 6700 (option 3) or email [email protected] Set depth to avoid cutting into rafters. Right-click DWG icon to download AutoCAD file or PDF icon for PDF file. During my employment with TXU, the electric company for almost half the State of Texas, the hole depth formula was 10-percent of the pole height plus 3-feet. UNAFFECTED BY TERMITES, WOODPECKERS AND VERMIN ENGINEERED POLE Composite utility poles are an engineered product. Poles that show signs of internal or external decay are fully excavated to a depth of 18" to determine the extent of decay at the groundline. Whenever any electrical wiring for service connection is installed whether regulated by inspection authorities or not, provision shall be made for the installation of metering equipment. They came, drilled the hole, set the pole, and left in about 30 minutes. GUYS AND ANCHORS V. A rare look inside a telephone exchange There's also a 360-degree clip from the top of a telephone pole, with the hope of reducing the time it takes to install and fix problems on the. Accuracy is found to be better than 2% of the height measured, which equates to 3/16” over a typical communications cable vertical separation of 15”. 01 Installation in Earth. Utility Solutions is focused on applying a depth of expertise and proven capability to assist with utility related activities across the entire project lifecycle. The service will not be energized until the county electrical inspector has inspected and approved the. 4 Document No. We wait to install the baseboard until all the shelving is in, too, because the baseboard has to be cut around the dividers. Each specific basketball pole has a suggested ground depth to ensure a secure anchor. The sizes go down incrementally by two inches of tip circumference. On top of these benefits, we offer a truly GREEN product that is made from recycled material and is 100 percent recyclable. Determine the best. Pole lengths of 5. All mobile homes must use a permanently installed meter pole. Main Electric LTD. Use 24" radius 90 degree schedule 40 bend at pole, install flush against pole and plug end at grade level unless otherwise instructed. As a national, leading service provider to the utility infrastructure sectors, Zinfra has gained a reputation for our breadth and depth of experience delivering… 30+ days ago Sub-contractors - Smart Meter Installation works. 75m embedment. Corrugated Metal Panels are rippled metal sheets that are used primarily for roofing, decking, flooring, and siding. Backyard Wooden Pole Installers for Your Home. Field Cutting and Drilling A chain saw is the common tool for making cuts and. of a utility ground, buried water pipe, or buried telephone wire. The pole from the POCO itself is over $2k. For these towers, there are five concrete foundations that must be created, one for the tower and four for the guy wire anchors. The member's electrician must completely wire the pole and meter socket leaving 18" leads out of the weatherhead near the top of the pole. The cable travels over my next door neighbours garden to the pole on the other side of the street at around 45 degrees. Where a group of residential buildings located on a single lot: b. 8 - Level the pole. A flagpole is a wonderful enhancement to any piece of real estate. Unless you have the heavy equipment to drive the pilings into the ground, you'll either need. Utility Accommodation Policy and Standards Manual 2016 Revised: 12/01/2018. Example: If you want your security light to stand 12 feet tall you will need to buy a 18 foot pole. So if a pole near you has fallen down, or something has dropped off one onto your car windscreen then it is nothing to do with us. At Bitner Electric we stock the utility poles we install, so we are able to offer our customers a fast and affordable. Underground Utility Line Crossings 74 2. Construction of aerial cable involving the use of existing utility poles, requires access permits from the owner of the pole. A hole in firm, rocky terrain does not need to be as deep as a hole in soft soil. 4 : Remove timber pole : 1-4. 5 feet below the base of rail (BBR) will be maintained except that a minimum of 5 feet BBR will be maintained for fiber optic cable wirelines. The following is the trenching and conduit installation requirements for West Oregon Electric Cooperative (hereinafter called WOEC). Installation Equipment. To save yourself from having to dig a deep hole to install the rod in, you can opt to use water instead. utility locations and/or relocations, any utility permitting [23 MRS §52] required by the Municipality, and any pavement restoration requirements. Unlike a footing or poles for a pole barn, fence posts don’t typically extend past the frost line. Installation of utility facilities on highway right-of-way must be. DECEMBER 2008 ICE STORM Appendix F - Overhead Line Construction. Vertical clearance over roofs of buildings, where permitted, with prior approval of the Company. Backyard Wooden Pole Installers for Your Home. Outrigger- Maui 15P pole w/crossarm Click on pole for PDF. Direct Burial Light Pole Installation. Proper maintenance of wood poles (which includes inspection and application of remedial treatments) helps add many years of safe, reliable service life to your pole plant, thereby reducing unnecessary or premature replacement costs. Base of excavated area to be well compacted granular material or100mm concrete slab. Screw must go through both Top and Bottom (Inner) Poles. I purchased two 21' schedule 40 galvanized steel pipes (3") along with #4 rebar and some 5/8" stainless steel all thread that I plan on putting through the base of the poles in a criss cross fashion to prevent the poles from turning in the concrete. Wood poles. All of our dance poles feature high quality production methods and we only use real stainless steel and genuine brass. Shop for appliances, paint, patio, furniture, tools, flooring, hardware, lighting and more at Lowes. when determining the appropriate wall thickness for an installation. Beacon Street reconstruction is Somerville's first roadway project that will include an exclusive bike lane that is separated from the roadway and traffic. Occasionally they fall, and when they do, they can cause severe injuries. Trench must be between 26" and 36" in depth with 24" minimum cover over PVC. During my employment with TXU, the electric company for almost half the State of Texas, the hole depth formula was 10-percent of the pole height plus 3-feet. Depth of Underground Lines - The depth of underground lines shall be as specified herein for each type of utility. Our transmission experience includes tapered tubular and standard shape transmission structures. Lay all flagpole components out. 1702 – available 24/7. Watch for nails. The height of the pole is going to depend on the application you have in mind. A shop vacuum can be used to install the mule tape tied to a small rag with a knot. 6 Depth of Cover Dec '94. We stock the poles we install, so we are able to offer our customers a fast and affordable solution to their utility pole projects. (Please note that some of these telegraph poles may still have some metalwork fixings/ steps attached) These telegraph poles are a good quality but do have defects being reclaimed. The Public Utilities Commission of Ohio (PUCO) affects every household in Ohio. Skip navigation New Utility Pole Install Thumb Licker. 8 Customer Owned Pole for Non-Fixed Premise Fig. When you contact your local building department to get your building permit, ask what the frost depth requirement is and the required size and shape of the footings. For more information on trusses, banding, and installation equipment, please call 770. Convenient shapes and styles with durable finishes for years of reliable service. How to Install Posts in the Water for a Dock or Pier. Don't forget that erosion or root structure growth may shift the locations of your utility lines, so remember to call again each time you are planning a digging. In frigid Minnesota, the frost depth is 42 in. Backfill with native material in 1 foot lifts to match surrounding grade. For proper display of these standards in MicroStation extract these font files into the C:\Windows\Fonts directory. The requirements for grounding or sectionalizing sidewalk and truss guys, and the conditions under which they. 4, "Utility company standards are generally used as a guideline for the installation of challenge course poles. While the underground services eliminate unattractive overhead pole lines, cabling and transformers, the installation of utility company transformers presents challenges of a different sort. Bat houses should not be lit by bright lights. Standard Details and Specifications for Public Street Landscape Improvement Projects D-9 Installation Detail Fiberglass Liner Assembly Gallery E-21 Pole Top. It is not intended to be all-inclusive, but rather as an introduction in plain language to the meaning of some otherwise arcane sets of initials and combinations of words. There is also a minimum top circumference that is the same for all species and lengths. 1 SPECIFICATION FOR ELECTRICAL INSTALLATION GENERAL SERVICE CUSTOMERS Brantford Power Inc. In addition to telephone pole installation, we also specialize in parking lot lighting. Storm Damage Contractors for Pole Lights Utility Poles, Sports Lights. HSE and other organisations have produced guidance on electrical safety that is suitable for a wide range of industries and technical competencies. 1702 – available 24/7. Over the center portion of the street, 18' 0" minimum. Install the pole number tag using two nails, locating the bottom of the tag at a minimum of "Pole Setting Depth 26. GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities, including electric power, telephone, fiber optics, telegraph, cable television, and other communication and data transmission facilities, both overhead and underground. So if a pole near you has fallen down, or something has dropped off one onto your car windscreen then it is nothing to do with us. So the children playing on the sidewalk were in short pants, some were barefoot. Pole Foundation Installation. virginia department of transportation standard title page index of sheets section 1300 - traffic control 02/16 road and bridge standards sheet 2 of 4 1300. A full 4′ of post depth is preferred. Two options are provided as indicated below:. The pole is round so can I mount a board then mount panel to it ? I don't understand the grounding. Without them buildings would not have any stability or be able to stay square and true. See illustrations for special applications. It shall comply. Attachment to existing utility poles is encouraged; once permission is secured from the utility pole owner, an encroachment agreement can be submitted. That means I can dig through 5′ of solid rock, with up to 8,000 pounds of down pressure. Box 308, Brantford, Ont. Installation Standards. Utility poles come standard in Type 1 colour and finish - which is a plain grey and with a mold finish. Example: Overall pole height: 30 feet, the pole should be buried: 3 feet + 2 feet = 5 feet below grade, and 25 feet above grade. The SFPUC is responsible for the storage, quality control and distribution of the area's drinking water. • Conduit installation should not start until the staking has been approved by a Tampa Electric inspector. If there is to be pressure or a heavy wire load on the pole, you'll want to buy a new pole. Course Outline. 20 per square foot and closed-cell spray foam which is about $1. If you want to build a pier or a dock, you need good, sturdy pilings or posts to support it. In Sydney, we recommend customers to install timber power poles rather than steel power poles. Proper maintenance of wood poles (which includes inspection and application of remedial treatments) helps add many years of safe, reliable service life to your pole plant, thereby reducing unnecessary or premature replacement costs. Ground from meter pan to rods but what abt. The area around the pole shall be backfilled with suitable material and thoroughly compacted to the satisfaction of the Engineer. Used in place of support brackets when stacking 2 or more shelves. For safety reasons, the pole is to be kept free of all obstructions such as antennas, basketball goals, etc. Cut through shingles to roof sheathing with utility knife. Differences in functional requirements between DoD Components may exist due to differences in policies and operational needs. The hole should be wider than the pole on all sides to accommodate the concrete. Would depend on how tall the walls are. Corrugated sheet metal is tough, light weight, weather resistant and practical. Here's why. Here is a simplified method of determining if a pole needs to be set deeper. Telephone Select Backfill 12'' Min. If you have doubt about it, shore/slope the trench. For 1/0 triplex or larger, installation of a guy wire to an anchor in the ground may. Homes without a current fiber network, however, will need to have new lines run to bring the fiber services in. Bolts are provided to attach to a standard 50 foot, class 2 wood pole for normal construction. With our huge variety of wooden, wire shelving, and book shelves, The Shelving Store is a great way to organize and personalize your home or business. • Beneficial Physical Properties • Good insulator, resilience to wind and mechanical impacts • Easy Maintenance and Modification in service • "Green" • a treated wood pole has a reduced environmental impact when compared to other utility pole materials. Compliance with Department Policies, Standards, and Specifications. RS composite poles provide distinct advantages over wood, steel and concrete. Construction of aerial cable involving the use of existing utility poles, requires access permits from the owner of the pole. The hole should be wider than the pole on all sides to accommodate the concrete. shored or sloped. The Wanapum. ASTM's wood standards are instrumental in the evaluation and testing of the physical and chemical properties of a wide range of wood and wood-based products. on utility poles. Dimensions: 13 1/2" Long and 2 1/2" Tall (Valet Pole extends 10") Color: Polished Chrome. Telephone, communication, and CATV cable routes and equipment locations. Completed geotechnical review of site soil conditions to confirm soil load bearing capacity. Section drawings of any road crossings or joint trenches (road crossings shall be approximately 90 degrees) h. A minimum depth of 4. a technician will bring a fibre-optic cable from a telephone pole to your business. Since a 30 foot utility pole needs to be set in the ground 5 feet. Learn the proper way to attach a flag to a flag pole at FlagandBanner. While a pole may have sufficient strength to withstand side strain of angles up to 5 degrees for small conductors, it is usually advisable to install a guy and anchor to prevent the pole from leaning. Wooden materials covered here include timber, lumber, wood-base fibers, commercial softwoods and hardwoods, wood preservatives, laminated timber, and composite lumber to name a few. Use 24" radius 90 degree schedule 40 bend at pole, install flush against pole and plug end at grade level unless otherwise instructed. The anchor assembly. Underground Service Page 4 - 10 ElEctrical SErvicE rEquirEmEntS New: 10/90 Revised: 03/30/2015 TRENCHING DETAIL Figure 4-1 Secondary Distribution Trench With Joint Utilities 24'' Min. The requirements for grounding or sectionalizing sidewalk and truss guys, and the conditions under which they. 1 standard pro­ vides insight to variables considered in the design, production, and use of utility poles and gives. The depth of the hole setting a pole must be at least 1/3 the length of the pole or be supported by braces. structures, massive sign supports, utility poles, and other ground-mounted obstructions. I recently did a job and lost on it. During the design phase of aerial cable plant proposed for installation on AEP/AEP-OH’s poles, Communication Companies shall comply with the following policy: Safety is a concern for everyone. Utility Marking Trace Wire Guide. With quality aluminium alloy frame work, our racks are able to withstand up to 250kg per shelve. Manual Pole Setting. Specification Data For Pipe Guards (Bollards) With increasing threats vehicle barriers are becoming more popular at many facilities such as gas stations, shopping malls, and restaurants etc. Section drawings of any road crossings or joint trenches (road crossings shall be approximately 90 degrees) h. Pile bracing should only be for comfort of the oc - cupants, but not for stability of the home. Ground Rod Installation. 9 Temporary Service Entrance, Tripod Mounted Fig. 03 Direct Buried Poles 615. H5 poles can range from 45 to 125 feet tall and are no less than 37 inches in circumference at their tip. Anchor was $140ish. Lay in the cable loose, not tight. These methods,while expensive, will avoid or greatly minimize impacts to wetlands. To expedite service connections and treat each of our customers equally and fairly, we have developed installation standards for gas and electric services. Installation and complete, they were somewhere in the $3k-$4k range. Without them buildings would not have any stability or be able to stay square and true. Minimal ground clearance is maintained by applying gentle braking force to the let-off reel. If concrete poles are set deeper than their normal setting depth, the crew installing the pole shall attach piece of #4 CU to the pole grounding loop to make it accessible from the groundline. The diameter of the normal vent opening shall be equal to the size of the fill/withdrawal opening,. Engineering to certify of suitability of footing for the installation site. The depth, length, cover, and grade of the pipe; by dimensionally referencing curb and gutter, shoulders, roadway surface, ground, and all other subsurface facilities or utilities located above or below the centerline of the pipe. The general rule of thumb is to bury one-third of the pole for good stability. Fig 14: This is the pole for my house. A pesticide may be added to the inside…. Info the utility needs to determine voltage: County, Township, & Street address and/or a pole number for A. Chose from Garvin's expansive line of adjustable depth device rings to find the best fit for your project. The report shall list all amounts billed due to slow meters, as well as refunds due to fast meters. H5 poles can range from 45 to 125 feet tall and are no less than 37 inches in circumference at their tip. PI & A will provide you with the layout, design, quantity, class (diameter) of poles, and specific length needed. BOLTS Guy plates are provided with bolts for each plate, but may not be needed if already supplied with another plate. Truss Installation Equipment. e = eccentricity = M u /H u. Comprehensive installation by our delivery team that ensures dig alert coordination, temporary power pole installation, pole bracing, and multi-point inspection to ensure the temporary power pole is installed safely, to industry standards, and is ready for use by your team. We offer fast and affordable solutions for utility pole, power pole and telephone pole installation. Installing a flag pole isn't extremely difficult. NEI Electric Power Engineering Page F-3. Use PVC cement on all joints. One of the most common approaches to installing a mailbox post is very similar to the way a farmer sets a fence post. Minimal ground clearance is maintained by applying gentle braking force to the let-off reel. ComEd may elect to install a service pedestal near the base of the pole. 215 ,TxDOT is required to submit its UAR for approval by the FHWA, which has approved it. Date 02-01-03. During my employment with TXU, the electric company for almost half the State of Texas, the hole depth formula was 10-percent of the pole height plus 3-feet. Direct Burial Light Pole Installation. Can I include utility improvement costs the water, sewer, gas, electrical, and telephone in my mortgate? What are the minimum burial depth requirements for gas piping and electrical conduit? Minimum depth requirement for sewer, gas, water, and electrical lines/conduits?. These “Special Specifications” supplement the latest edition of the “Standard Specifications for Public Works Construction (Green Book)” and the current edition of the. Would depend on how tall the walls are. Welcome to the Public Utilities Regulatory Authority website. Install the pole number tag using two nails, locating the bottom of the tag at a minimum of “Pole Setting Depth 26. The following is the trenching and conduit installation requirements for West Oregon Electric Cooperative (hereinafter called WOEC). In Sydney, we recommend customers to install timber power poles rather than steel power poles. 75m embedment. Commercial light pole installation is a systematic process that flows from the conceptual and the general to the systematic and precise. Once the Top pole is to the 6” Mark on the Warning Sticker, lay Pole Assembly on its side on two padded saw horses.